|
|
|
| No. Panggil |
: |
|
|
| Judul |
: |
ANALISA KETERLAMBATAN PELAKSANAAN
PROYEK KONSTRUKSI BANGUNAN GEDUNG
(SUDUT PANDANG PEMILIK PROYEK, KONSULTAN DAN KONTRAKTOR DI KOTA SERANG) |
|
| Nim |
: |
41110110006 |
|
| Nama |
: |
TAUFIK HARRISUSANTO |
|
| Pembimbing |
: |
Marwadi Amin |
|
| Jurusan |
: |
TEKNIK SIPIL |
|
| Jenis |
: |
Skripsi |
|
| Penerbit |
: |
Universitas Mercu Buana Press |
|
| Tahun |
: |
2014 |
|
| Subyek |
: |
ANALISA KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG |
|
| Download |
|
 |
|
| Cover |
: |
Download [ 378910 bytes ] |
|
| Abstrak |
: |
Download [ 83847 bytes ] |
|
| Pustaka |
: |
Download [ 612435 bytes ] |
|
Kembali
|